Gladstone Energy and Ammonia project – draft terms of reference for an environmental impact statement

Closed 21 Dec 2018

Opened 24 Nov 2018

Overview

Queensland's Coordinator-General invites you to have your say on the draft terms of reference (TOR) for an environmental impact statement (EIS) for the Gladstone Energy and Ammonia project.

Prepared by the Coordinator-General, the draft TOR sets out the matters to be studied within the EIS. You are invited to comment on whether the draft TOR adequately covers all the matters Australian Future Energy Pty Ltd (AFE), must address when preparing the EIS.

About the project

The proponent, AFE, proposes to develop the $1 billion Gladstone Energy and Ammonia project. The project components include a coal supply system, an above ground coal gasification plant, a gas processing plant, an ammonia processing plant, a combined cycle gas power generation plant and utilities and ancillary infrastructure. The above ground coal gasification plant is designed to convert up to 1.5 million tonnes per annum of coal into ammonia, synthetic natural gas and electrical power.

The proposed project site is located on Lot 57 on SP257848, 185 Landing Road, Yarwun, approximately 15 kilometres north-west of Gladstone, within the Gladstone State Development Area.

How to comment

There are a number of different ways to provide comments on this draft TOR. You only need to provide comments using one of these methods. Replicated responses received through different methods will only be counted as one submission.

Send your comments to the Coordinator-General using one of the following methods:

  1. Click on the ‘Make a comment’ link below
  2. Email your submission to geap@coordinatorgeneral.qld.gov.au
  3. Post your submission to:

Attention: Coordinator-General
C/- Project Manager – Gladstone Energy and Ammonia project
Office of the Coordinator-General
PO Box 15517
City East Qld 4002 Australia

You can read the draft TOR here or view a hardcopy of the application at one of the following display locations between 24 November 2018 and 21 December 2018 during the venues' business hours:

  • Gladstone City Library, 39 Goodoon Street, Gladstone
  • State Library of Queensland, Cultural Centre, Stanley Place, South Bank, Brisbane.

Note: If you wish to attach anything (e.g. maps, images or supporting documents), please use the email option instead of the online form.

What happens next

After consultation closes, the Coordinator-General evaluates all properly made comments received on the draft TOR, then issue a final TOR to the project proponent. The proponent then has 18 months to prepare a draft environmental impact statement in accordance with the final TOR.

Audiences

  • Community
  • Local government
  • Environmental
  • Industry
  • Interest group
  • State government

Interests

  • Economic development
  • Environment
  • Industry
  • Major projects
  • Planning
  • Environmental impact statement