Hummock Hill Island Development project - application for project change

Closed 10 Oct 2016

Opened 10 Sep 2016

Overview

Queensland's Coordinator-General invites you to have your say on an application for project change for the Hummock Hill Island Development project

The Coordinator-General's evaluation report approving the project was published in February 2011

Eaton Place Pty Ltd has applied to the Coordinator-General for a change to the project, which involves:

  • reduction in the total master plan area from 518ha to 465ha, including a reduction in the development footprint from 341ha to 307ha, and a reduction to open space, golf course and parkland from 177ha to 158ha
  • provision of buffer areas and reduction in disturbance to native vegetation
  • retention of approximately 50 per cent of trees throughout the development
  • relocation of the golf course
  • the desalination plant to be permanently located within the proposed development (previously proposed temporary) 
  • removal of the waste transfer station and the boat ramp at Colosseum inlet
  • inclusion of an Ecological Design Centre and a native plant nursery.

 

The Coordinator-General will consider all properly made submissions before preparing a change report either approving or refusing the change.

 

How to comment

There are a number of different ways to provide comments on this application for project change. You only need to provide comments using one of these methods. Replicated responses received through different methods will only be counted as one submission.  

1. Read the application for project change here.

OR

Visit one of the following display locations between 10 September 2016 and 10 October 2016 to view a printed copy of the application for project change:

  • Gladstone City Library, 39 Goondoon St, Gladstone
  • State Library of Queensland, Cultural Centre, Stanley Place, South Bank, Brisbane.

 

2. Provide your comments by clicking on the 'Make a submission' link below

OR

Send your submission to one of the following:

  • Email: hummockhill@coordinatorgeneral.qld.gov.au
     
  • Post: Project manager – Hummock Hill Island Development project
    Coordinated Project Delivery Division
    Office of the Coordinator-General
    PO Box 15517
    City East Qld 4002 Australia
     
  • Fax: +61 7 3220 6502

Note: If you wish to attach anything (e.g. maps, images or supporting documents), please use the email option instead of the online form.

What happens next

The Coordinator-General will consider all properly made submissions, the draft EIS and revised draft EIS before preparing a final evaluation report either refusing or approving the project.

Audiences

  • Community
  • Local government
  • Environmental
  • Industry
  • Interest group
  • State government

Interests

  • Economic development
  • Environment
  • Major projects
  • Environmental impact statement